- pde Rookies
- Top career opportunities for HTL alumni
- BIM goes LEAN – a progress report
- Gold vs. Platinum certificate: Who still strives for Best-in-Class in the construction and real estate industry?
- pde Christmas video
- Presenting the new pde Integrale Planung
- Shiver me timbers! A new CLT plant on a massive scale
- MCI Innsbruck Full Service Contract
- DGNB Platinum awarded to HOWOGE tower
- Field report: Building Information Modeling (BIM) in the build phase on the construction site
- 10 years of pde
- Surveying and modernisation of the Erfurt trade fair exhibition halls
- Sustainable building with certificate? We'll get you there.
- LEAN Webinar on optimising construction processes
- pde wins residential project in Münster
- FAIR particle accelerator wins SOLID Bautech Award 2021
- Taking a look at the new Wien Museum
- MCI Campus architectural competition judged
- Georeferencing and laser scans in the BIM process
- BIM use case: Clash detection
- pde wins New Courts tenant fit-out contract
- BIM pilot project in railway construction
- Lean Construction Management – interview with our successful Master’s graduates
- An internship at pde
- Job diversity at pde
- Sustainably certified
- 3rd place in the architecture competition for the new building of Gewerbehof Freiham
- LEAN Construction: A (video) field report from a hotel construction site in Vienna
- York-Quartier/Baufeld C10: pde design takes shape
- pde 10-year anniversary party for employees
- Successful sustainability performance
- Merry Christmas!
- MCI New Building: From Practice to Teaching
- We make every building future-proof: With dynamic building simulations
- Planning without borders
- pde talent qualifies for the national championship of the professions
- Top places in design and architecture competitions
- 1st place in architecture competition "New elementary school in the Böhlerleben district"
- Precision meets efficiency: Laser scans and georeferencing on the construction site
- Structural design - mastering challenges and saving resources
- Climate risk analysis for practitioners
- Digital duet: BIM and augmented reality
- Saving energy thanks to M&E Planning
- Ignite the LEAN idea
- We work on the circular future
- The secret of success: Regular Communication
- We certify the first sustainable construction site
- Wood as an example of sustainable construction
- The pde Infoday 2023 - well informed and motivated
- pde Talent with top placement at the state championships of the professions
- Behind the scenes of the Koralm Tunnel
- Merry Christmas!
- Our fathers on maternity leave
- Vienna Airport: LEAN, BIM and augmented reality
- Overall planning performance of the Frauen-Kopf-Klinik Innsbruck
- BIM coordination for the new office and administration building for the German Bundestag
- RAW Innovation Campus Potsdam
- BIM use cases for the major ElbX project
- Christian Hochleitner new Commercial Managing Director
- A Reality Check for your construction project
- Wilhelmsburg care facility
- General planning of the Brüder Grimm School in Meerbusch
- An internship abroad in Sweden
- Standing shoulder to shoulder: York Quartier Münster
- Retirement home Preßguts
- Our new expertise in timber engineering
- Construction of the LeopoldQuartier begins
- BIM³ Roadshow in Graz
- Europäisches Patentamt
- A new dimension in timber construction
- Prejudice: Wood burns better!
- Christian Hochleitner in the vodcast
- Sustainability meets top talent
- Top rankings with well over 20,000 competitors
- Results of our pde employee survey
- Visit from students from Hamburg
- Fire test and extinguishing attack at over 1000 degrees
- Green, greener, greenest: the construction site of the Village im Dritten
- pde management workshop
- Our partners in timber engineering
- We are an official klimaaktiv partner
- Prejudice: moisture damages wood
- Prejudice: Wood is expensive and time-consuming!
- Workshop for our managers
- Our planning expertise for the Semmering Base Tunnel
- Expertise from cycle managers
- Revitalization of the underground car park of the Frauen-Kopf-Klinik Innsbruck
- Optimum construction progress at LeopoldQuartier
- klimaaktiv partner of the month
- CircCon research project
- The pde at the Adventure Camp
- Certification of Sellerstrasse 17 in Berlin
- Efficiency and convenience thanks to sensor data in BIM models
- Renovation and modernization of the Haus der Gesundheit
- Does a building have to be green(er) to be sustainable?
- Why build with wood?
- Top position for our apprentice in the professional competition
- Insight into three pioneering timber construction projects
- Sustainable cooperation in Berlin
- BREEAM certification for our headquarters
- Our wood expertise at LeopoldQuartier
- Neue Geschäftsführung der pde Deutschland
- BIM in action: The southern expansion of Vienna Airport
- The pde Infoday 2024
- Focus on fire protection: New Samson site in Offenbach
- WiredScore Gold certificate for the sellersiebzehn project
- Fire protection at the Kaiser Wilhelm Memorial Church in Berlin
- Expansion of the pde management board
- Groundbreaking ceremony for green living
- We live BIM - for the construction projects of the future
- Sustainable building with wood: The European Patent Office
- Golden prospects at the QUBES Technology Campus
- Structural design: the backbone of every building
- Award for an outstanding achievement
- Milestone at the LeopoldQuartier
- Topping-out ceremony at the Vis-à-Vis in the Village
- Next milestone for the LeopoldQuartier
- The first gold for sustainable dismantling
- Visible and strong - bold timber construction planning is convincing
- Whitepaper: Climate risk analysis
- Wood hybrid: The best combination of two worlds
- On point: point clouds as the basis for planning processes
- We plan the education of tomorrow
- Tunnel vision with foresight
- Sustainability pays off - also in the hotel ranking
- Digital, sustainable, integral: General planning at the highest level
- Vienna meets Vancouver
- Planned green, built smart
- Deconstruction instead of demolition - challenges and opportunities
- BIM Champion 2025 - we are in the final
- Things are moving in tunnel construction - with LEAN
- Update on the B.R.I.O. housing project
- Our structural design in the LeopoldQuartier
- BMW: Building the future in the heart of Munich
- Planning during ongoing operations at BMW
- Plan digitally, build optimally - BIM makes it possible
- LEAN on the production line - at the BMW Group plant
- Where precision begins: Our construction preparation for BMW
- Excellent TGA planning
- Our fire protection at the Future Center competition in Halle (Saale)
- Timber construction with vision for the education of the future
- Milestone at the LeopoldQuartier: the last wood-concrete composite element
- LEED Platinum for the sellersiebzehn project
- Tradition meets technology - The Admiralspalast Berlin
- Tradition meets technology - The Admiralspalast Berlin (copy 1)
- Hirschfeld Project: EU Taxonomy Compliant
- TGA meets theater – the technology behind the scenes
- Fire protection: When history meets modern use
- Our BIM expertise for Munich Central Station
- B.R.I.O.: The last wooden component is in place
- Easy to build – easy to dismantle in an environmentally friendly way
- Update from the construction site of the Zentralberufsschule Aspern
- Before the spark ignites – fire protection at the highest level
- Boarding House Böblingen – Sustainability meets modern comfort
- Digitalisation in the major Koralm Tunnel project
- Internally thinking outside the box
- Our team of senior auditors continues to grow
- Project Am Postbahnhof in Berlin
- Video: Update on the ElbX project
- Digital planning for tomorrow's education
- ZAM Spaces Freiham Community Centre MK 2.3
- Update on the CircCon research project
- Successfully modernised: The house in the centre of Berlin
- Our services for the European Patent Office